December 24, 2025

A513 - Backup CMU Wall Assembly

Study of a backup CMU wall assembly emphasizing load-bearing masonry, continuous closed-cell insulation, clear air space, and code-compliant masonry tie spacing.

December 23, 2025

A512 - Interior Stud Corner DETAIL

Study of a two-stud interior corner with integrated 1x4 backing to support gypsum board attachment and maintain constructability at wall intersections.

December 22, 2025

A511 - PARAPET DETAIL

Study of parapet construction emphasizing roof-to-wall transitions, moisture management, and thermal continuity at the building envelope edge.

December 21, 2025

A510 - RAINSCREEN WALL ASSEMBLY DETAIL

Study of a ventilated rainscreen wall system focusing on moisture management, thermal control, and panel attachment strategy.